I'm sorry my posts these days
hasn't been as visual as they usually are.
I'
ve been recovering from my trip abroad and frame painting at the same time.
Shot 2 has been completed. I'm currently half way through shot 4. Me and
Iredia had a very detailed meeting on the 4 other shots waiting in line. It gets complicated since
theres a change of time, so the colours of the scenes will gradually fade from the greenish greys > blues>orange>
reddish tones>purple to then finish off with darker contrasting purples.
The Mayfly is supposed to reflect the traditional arts of Chinese
calligraphy, however, By keeping to the
grayish green principles our film overall will have a dull
impact. Which is why we want to bring in lovely animated time changed. Since this is all colour, It is my job to get this right. I did a few tests in
Hong Kong, I took a few days away from going out, locked myself in the hotel to get work done. It was hard, and so tempting to drop the idea of
working on holiday, but I really
couldn't leave
Iredia like that. I constantly emailed
Iredia and Michelle from team smitten to constantly get updates on our teams progress, and what I needed to get done for them. Smitten has been done, so I've had nothing to submit to Leader Matt.
I've had
skype meetings to discuss changes to the Mayfly shots. There was one time we had a meeting while
Iredia was at
Ravensbourne. But it was so
laggy we had to switch the
screensharing and
webcam off. This then delayed a days worth of time since
theres an 7/8 hour difference in the two countries.
Even though we all took my personal trip in a professional manner, and continued to work as if I was still in London, it seems there are people within our COURSE
that's got so stressed with their own projects
they've stuck their noses into our business, spreading rumours like I've ditched
Iredia and Smitten. Its upsetting, and really hurts my team members
especially. I only found out after coming back. Its disgraceful and immature. I wished they would just butt out of other peoples business. I took the trip as a BUSINESS trip, taking 3 of those days to do
official things which required lots of waiting time in government buildings..not fun. Then I had to lock myself in my hotel room to get work done. So I believe I achieved working in a professional manner. I
didn't want to go in the first place, but for my own future I had to. And definitely
don't deserve to be bashed at like that, especially behind my back its just not called for. Its frustrated
Iredia since he knew what was really going on. The extra stress was
seriously not needed, I feel really bad for stressing him so much.
I'm really sorry dude T_T
And for that, on Monday, even though I was
jetlagged, I planned to have a meeting with my
EnE group, printed posters and had further discussions on our product and expansion. Plus what we needed for our
summative and
presentation. We then went out to the
london graphic center to get a few materials to finalise our product (OUR
KEYRINGS NOW HAVE FACES!!^^) We all went to eat, went to play child of Eden together, which really brought back the fun, and was a great way to
de-stress ourselves. Personally I felt it was a great way to catch up with everyone^^ It seems people have been going nuts, but we believe having a fresh head and actually moving, doing a bit of exercising instead of locking ourselves in makes the pace of of work faster and more accurate.
Enough
rambling,
I've sorted my 3 folders out for submission, I had a few bits to transfer from my laptop, work to finish.
Todays Task:
Finishing Shot 4
To start and finish the EVOLUTION shot (not sure what shot that is)
Leaf animation test.
Clean up 2000 words for
EnE Report + sort out
everyones slides (copy n paste their slides onto the presentation.
5 things to do,
that's more then enough for the day =) Its not even 10 yet and I've written so much^^
Shall blog my process throughout the day (its a nice break from frame painting =P)